VISU EnergyEnergy observability
Audit · Power quality · On site

The energy and power quality audit that installs anywhere.

A turnkey service at your disposal: our teams come to your site and install the case in under an hour, with no shutdown, on any electrical system. A single case monitors 9 three-phase feeders. You see where your energy goes and what you can save.

Temporary, by design. See why
Load curves · Workshop, 3 feedersLive
Expected night baseload Abnormal night consumption Likely air leak, alert sent ProductionNightProduction
CompressorsHVACLighting
9 three-phase feedersmonitored simultaneously by a single case
See the platform →
< 1 hto install
20-40 %savings identified
D0to understand an incident
Temporary measurement

Measure before you decide. Not after.

Permanent metering means works and budget. The VISU Box measures first, for a few days or a few months. Then you decide, based on facts.

And if metering needs to stay, its value is already proven.

  1. 01

    Validate before works

    Transformer, generator, EV chargers, battery: sized on the real load, not on an estimate.

    Simulate generator and battery →
  2. 02

    Prove before / after

    Same feeders, same conditions, before then after the action. Savings are demonstrated for energy certificates, performance contracts or audits.

    M&V in detail →
  3. 03

    Follow the diagnosis on a complex site

    The case moves from one switchboard to the next. Measurement goes where the problem is, instead of staying fixed.

  4. 04

    Convince before permanent metering

    Show the end client what measurement reveals. The sub-metering project justifies itself.

Field logistics

Monitoring comes to you. Fast, anywhere.

Whatever the type or size of your installation or project, our teams come to you. Transport, installation, checks, removal: they handle it all, from a single switchboard to an entire site.

350feeders

From 32 to 3,000 A, across 12 sites

6 technicians · 10 daysMajor international sporting event, Paris, 2024

40generators

Generator sets at a festival

2 technicians · 5 days

1hour

The main switchboard of a hotel school

1 technician

Audit Flash

In the Paris region

Installed the same dayRequest an Audit Flash →
How it works

One case, one platform, one team

The VISU Box sits next to the switchboard. Our team supports you from installation to report.

1. Install

Three flexible current probes per feeder, up to 9 three-phase feeders monitored simultaneously. No shutdown.

2. Measure

Second-by-second curves, alerts and recommendations on VISU Live.

3. Report

The case leaves. Your data and recommendations stay.

Quiz · 2 minutes

8 energy myths. How many can you bust?

Generators, neutral, night consumption, savings: true or false?

Take the quiz
Take action

Measure your site as soon as next week.

  1. 1A 30-minute call about your needs
  2. 2VISU Box installed in under an hour, no shutdown
  3. 3Data, alerts and report on VISU Live
Book a demo
Chat on WhatsApp