Prove energy savings, don't estimate them

Energy savings certificates (CEE), mandatory audits, the French tertiary decree, performance contracts: all now require measured, verifiable savings. VISU measures before and after the works, with no shutdown, feeder by feeder.

Works Measured savings Adjusted baseline BeforeAfter Measured
The principle

M&V in three steps

Measurement & Verification (M&V) compares measured consumption with a baseline. It follows the international IPMVP protocol and the ISO 50015 standard.

1

Measure the baseline

Before the works, the relevant load is measured over a representative period: 2 to 4 weeks depending on the activity.

2

Adjust

The baseline is corrected for changing factors: weather, production, occupancy. Like is compared with like.

3

Measure after the works

Same measurement point, same method. The gap with the adjusted baseline is the real saving.

Savings = adjusted baseline − measured consumption.Without a measured baseline, there is only an estimate. And an estimate can be challenged.
The French regulatory context

What each scheme requires

Obligations are multiplying and controls are tightening. Everywhere, the same question: can you prove the saving?

SchemeWhat it requiresWhat VISU provides
Energy savings certificates (CEE)6th period, 2026-2030Real, verifiable savings. Tighter on-site and documentary controls. For specific operations, savings calculated from a baseline.Baseline and post-works measurement on the relevant load. Time-stamped report for the file.
Mandatory energy auditDDADUE lawAbove 2.75 GWh/year: audit covering at least 80% of consumption, filed before 11 October 2026. Above 23.6 GWh/year: ISO 50001 before 11 October 2027.Measurement of uses with no sub-metering, without works. The audit rests on data, not assumptions.
Tertiary decreeOPERAT platformCut consumption by 40% by 2030, 50% by 2040, 60% by 2050, against a reference year. Annual declaration.Breakdown by use to target actions, then proof of their effect.
BACS decreeBuilding automation mandatory above 290 kW, then above 70 kW from 1 January 2030.Real usage profile to set up the BMS, and before/after verification of the gain.
Energy performance contractA guaranteed result, measured under an M&V plan (IPMVP) agreed by both parties.Baseline and follow-up campaigns by a party independent from the operator.
ISO 50001 · 50006 · 50015Energy performance indicators and baseline, reviewed regularly.Feeder-level data to build and track the indicators.

Benchmarks as of October 2026, for information. The CEE file remains the responsibility of the applicant or obligated party; VISU provides the measurement and the report.

The VISU method

Isolate the load, measure what changes

IPMVP offers several options. The VISU Box is built for retrofit isolation of a piece of equipment or a feeder (options A and B): we measure exactly the scope of the works.

  • Installed on the relevant feeder with no shutdown, in under an hour
  • 9 three-phase feeders monitored simultaneously: the renovated load and its neighbours
  • Second-by-second measurement, computed in the case, no loss if the network drops
  • Before/after report, curves and quantified savings on VISU Live
Option ARetrofit isolation, key parameters measured
Option BRetrofit isolation, all parameters measured · ideal for VISU Box
Option CWhole-facility meter
Option DCalibrated simulation
FAQ

M&V and CEE, in plain words

Is M&V mandatory for CEE?

Not for every operation: many standardised sheets rely on fixed values. But specific operations, large files and the tighter controls of the 6th period push towards measured savings.

How long should we measure?

A period representative of operations: often 2 to 4 weeks before the works, as long after. Longer if the activity is seasonal.

Does VISU prepare the CEE file?

No. VISU provides the measurement and the report. The file is handled by the beneficiary, the installer or the obligated party.

Do we need fixed meters?

No. The VISU Box is installed temporarily, without works, then leaves. The data stays available on VISU Live.

Take action

Measure your site as soon as next week.

  1. 1A 30-minute call about your needs
  2. 2VISU Box installed in under an hour, no shutdown
  3. 3Data, alerts and report on VISU Live
Book a demo
Chat on WhatsApp